provly
Tuesday, 25 August

Good morning, David

Your jobs and reports, all in one place.

Boiler inspectionIn progress
Johnson Properties · Lekki Phase 13 photos · 1 voice note
AC repairCompleted
Ikeja Office Complex2 photos · Report sent
Electrical checkDraft
Flat 4B, Victoria Island0 photos · Start when ready
New job
Step 1 of 2

Tell us about
the job.

Add the details Provly will use in your report.

Boiler inspection
Johnson Properties
Step 2 of 2

Capture evidence

Photos and voice notes make a stronger report.

Site photos 0 added

⌁  Snap site photo

Voice note

Describe what you found and the work completed.

🎙 Voice note · 00:12
Provly AI

Analyzing photos

Finding equipment, work and visible details.

✦
✓ Uploading evidence
2 Transcribing voice note
3 Checking potential hazards
4 Building your report
Report ready
✓
PROVLY REPORT
Boiler inspection · 25 Aug 2026

Job summary

Inspection completed at Johnson Properties, 14 Lekki Phase 1. Boiler pressure valve showed signs of wear; water temperature was normal.

Work performed

✓ Pressure system inspected
✓ Equipment condition documented
✓ System operation tested

⚠ Potential hazard

Pressure valve requires attention within 7 days. Technician review is recommended before use.

Recommendation

Replace the pressure valve and retest the system during the next service visit.